Warehouse Expansion (Rainbow Cosmetics)

RAINBOW COSMETICS
REQUIREMENTS: PROVIDE ADDITIONAL PALLET STORAGE IN AN ALREADY BULGING WAREHOUSE

With warehouse expansion in mind, Doity Engineering Ltd was approached by the operations manager of Rainbow Cosmetics with the idea of providing additional pallet storage in an already bulging warehouse.

After several client consultations regarding potential locations, a Revlok platform 4.8 metres high and over 50 metres long was installed in dead space over the packing area providing the client with an additional 450 square metres of valuable floor space. The fully fire-rated platform was delivered with minimal fuss to the existing operation and completed on time.

Contact us

Doity Engineering Ltd
Rugby Road
Rochdale
Lancashire
OL12 0EP

Quick enquiry

Latest News